A complete study-to-proposal package for apartment buildings: roof and shading analysis, electricity data, solar sharing, battery, EV and canopy options, incentives and an AGM proposal.
From $4,900 (Per building (study to proposal stage)), including GST. Indicative starting price: the final fixed price is confirmed in writing after a site assessment.
For many apartment buildings, solar, batteries, EV charging and car park canopies are linked decisions: they share roof space, electrical capacity, incentives and owners' budgets. Our Strata Energy Transformation Package brings them into one coordinated process, from the first feasibility work to a proposal ready for the AGM, so the committee does not have to commission separate studies and reconcile them.
The package is priced from $4,900 per building as an indicative starting price, covering the study to proposal stage. The final fixed price is confirmed in writing after we review the building.
One team looks at the whole building, so the solar, battery, EV and canopy recommendations fit together instead of competing for the same roof space and electrical capacity. Every building is inspected in person. Blue Energy Solar is a New Energy Tech Approved Seller, which NSW strata funding requires, our installers are SAA-accredited and our electrical designs are prepared for installation by our licensed electricians.
Strata committees of medium and large apartment buildings that want one coordinated process from first feasibility to a proposal owners can vote on.
The package ends at the proposal stage. Installation, monitoring and any presentation at the meeting are quoted separately, so owners can approve the plan before committing to works. Any works need owners corporation approval and may also need a by-law, council approval and network approval.
From 1 September 2026, NSW offers incentives for eligible apartment buildings with at least 4 units and shared batteries of 20-200 kWh usable capacity, with a larger incentive when qualifying new or additional solar is installed in the required period. Confirm current values on the official NSW page before signing.
1. The committee requests the package and sends building plans, unit and car space numbers and 12 months of bills.
2. We confirm the scope and fixed price in writing and schedule the building inspection.
3. Our team inspects the roof, switchboards, car park and common-property equipment.
4. We analyse the data and model solar sharing, battery, EV charging and canopy options with incentives.
5. The committee reviews the findings and chooses the preferred options.
6. We prepare the owners corporation proposal for the AGM.
The price shown is an indicative starting price for the study to proposal stage; the final fixed price is confirmed in writing after we review the building.
Installation, monitoring and meeting presentations are quoted separately.
Safe access to the roof, switchrooms and car park must be arranged through the strata or building manager.
Costs, savings, payback and incentive figures are estimates and are not guaranteed.
Motion and by-law notes are guidance only and must be finalised by the strata manager or a lawyer.
Any works require owners corporation approval and may need council and network approval.
Where we work
Timing
How your request works
Prices include GST.