An on-site study for industrial sites: load logging on key circuits, process load analysis, power quality checks and a ranked plan to reduce demand and energy costs.
From $2,500 (Per site), including GST. Indicative starting price: the final fixed price is confirmed in writing after a site assessment.
Industrial sites often have a handful of loads that drive most of the energy bill: compressors, chillers, furnaces, pumps, conveyors and production lines that start together and push demand to a new peak. Our Industrial Energy and Demand Reduction Study measures those loads directly, links them to your production schedule and identifies practical ways to reduce both energy use and demand charges.
The study is priced from $2,500 per site as an indicative starting price. The final fixed price depends on the number of circuits logged and the size of the site, and is confirmed in writing before work starts.
Industrial energy decisions need measured data, not assumptions. Our licensed electricians install and remove logging equipment safely around your operations, and our team interprets the results with production realities in mind. Because we also design and install commercial solar, batteries and electrical upgrades, the options we rank are ones that can actually be delivered on your site, with realistic installation costs.
Manufacturers, processors and other industrial sites with large motors, compressors, refrigeration or process loads and high demand charges.
Logging equipment is connected by our licensed electricians under safe work procedures, and some connections may need a short isolation. Many sites prefer to schedule that during a planned shutdown or break. The study does not normally interrupt production, and we agree access times with you first.
Savings depend on whether operational changes are adopted and on future tariffs. Where batteries rank well, NSW business battery incentives from 1 September 2026 may apply to eligible systems; confirm current values on the official NSW page. A deeper investigation of power quality problems is available as a separate Power Quality Analysis.
1. Request the study and send us 12 months of bills, interval data and a single-line diagram if available.
2. We confirm the logging points, scope and fixed price in writing.
3. Our team walks the site with your staff and our licensed electricians install the loggers.
4. The loggers record typical production periods and are then removed.
5. We analyse the data, test demand reduction options and rank them by payback.
6. You receive the report and we present the findings to your management team.
The price shown is an indicative starting price; the final fixed price is confirmed in writing after we agree the logging points and site scope.
The site must provide safe access to switchboards and nominate a contact for inductions and site safety requirements.
Logging periods should cover normal production; unusual weeks may affect the results.
Savings and payback figures are estimates and are not guaranteed.
Any recommended works, including power factor correction, batteries or solar, are quoted separately and may need network approval.