Maximum demand logging and a written report showing how much electrical capacity your site has left for EV chargers, batteries, heat pumps and new equipment.
From $1,490 (Per site), including GST. Indicative starting price: the final fixed price is confirmed in writing after a site assessment.
Before adding EV chargers, a battery, heat pumps or new machinery, you need to know how much capacity your electrical supply really has. Guessing can lead to tripping main switches, an unexpected supply upgrade or chargers that are throttled all day. An electrical capacity study measures your site's actual maximum demand and compares it with the limits of your main switch, consumer mains and network connection.
Our licensed electricians install a logger at the main switchboard, record demand over a representative period and turn the data into a clear written report. The study starts from $1,490 per site. This is an indicative starting price; the final fixed price is confirmed in writing after we review the site details, the number of switchboards and access.
We install EV chargers, batteries and commercial solar, so our recommendations are practical and based on what will actually be connected. We avoid recommending costly supply upgrades when smart load management would do the job. We are a New Energy Tech Approved Seller with $20 million public liability cover, and all logging and switchboard work is carried out by our licensed electricians.
Businesses, strata buildings and commercial sites planning EV charging, batteries, electrification or new plant that need to know their spare capacity first.
Logged data beats estimates. Capacity calculations based only on equipment ratings often overstate or understate real demand. Logging over a normal operating period, ideally including your busiest days, gives a far more reliable answer.
If the study shows little spare capacity, options include dynamic load management for EV chargers, shifting loads, adding a battery or applying to the network for a larger connection, which requires network approval and can take time. Seasonal loads such as air-conditioning may not show up in a short logging window, so we adjust for them where your bills show higher summer or winter use. Strata buildings may need owners corporation approval before any upgrade.
1. Request the study and tell us what equipment you are planning to add.
2. We confirm the scope, the number of switchboards and a fixed written price.
3. Our licensed electrician visits, reviews the supply and installs the logger.
4. The logger records demand for 7 to 14 days during normal operation.
5. We analyse the data and send your written capacity report.
6. We talk you through the options and next steps.
The listed price is an indicative starting price; the final fixed price is confirmed in writing before logging starts.
Sites with multiple switchboards, large main switches or restricted access may cost more.
Installing and removing the logger may need brief supply interruptions or after-hours access.
The report reflects demand during the logging period; please tell us about any unusual operating conditions.
Supply upgrades need network approval, and strata buildings may need owners corporation approval.