Energy Market

Energy Market

Energy Market

Filter

Consumer Mains Upgrade

$2,490

Upgrade the consumer mains cable between the pit or pole and your meter board so your property can safely supply larger loads such as EV chargers and full electrification.

From $2,490 (Per property), including GST. Indicative starting price: the final fixed price is confirmed in writing after a site assessment.

SKU: BES-ELE-04
Brand: Blue Energy Solar
Pack size: Per property
Form: Installation
Categories: All Properties
Share it:

The consumer mains are the cables that carry electricity from the network connection point, at the pit or overhead pole, to your meter board and main switch. In many older homes they were sized for lighting, a stove and a hot water system. As households add EV chargers, heat pumps, induction cooktops and more air-conditioning, undersized or deteriorated mains can limit how much you can safely add.

A consumer mains upgrade starts from $2,490 per property. This is an indicative starting price; the final fixed price is confirmed in writing after a site assessment of the route, supply type and switchboard.

What's included

  • Assessment of the existing mains size, condition, route and maximum demand
  • Calculation of the capacity needed for your current and planned loads
  • New consumer mains cable sized for the upgraded demand
  • Conduit, cable supports or trenching along the agreed route
  • Coordination of disconnection and reconnection with an accredited service provider
  • Connection to the meter board and main switch, with testing
  • All electrical work by our licensed electricians, with compliance paperwork

Why Blue Energy Solar

Electrification projects often reveal the supply as the weak link. We calculate the property's maximum demand properly, including EV charging, heating and cooling, rather than guessing, and we check whether load management could avoid or reduce the upgrade. When the mains do need replacing, we coordinate the network side and plan the route to limit disruption to gardens, driveways and paths. If a switchboard upgrade or three-phase supply is also worth considering, we explain the combined options so the work only needs to be done once.

Recommended for

Older homes and properties adding EV charging, heat pumps, induction cooking or other large electrical loads.

Network coordination: the supply must be disconnected and reconnected at the network connection point, which is carried out by an accredited service provider. Depending on the change, a network application may be required.

Overhead or underground: overhead supplies may need a new point of attachment or bracket, while underground supplies may need trenching and new conduit.

Alternatives: load management for EV chargers can sometimes avoid a mains upgrade by keeping total demand within the existing capacity.

Price drivers: cable length and size, trenching through soil, concrete or rock, overhead or underground supply, and meter board condition.

Directions

1. Request an assessment and tell us about the loads you plan to add.
2. We inspect the existing mains, route and meter board and calculate maximum demand.
3. You receive a fixed-price quote, including any network requirements.
4. We coordinate network approval if required and schedule the disconnection.
5. Our licensed electricians install the new mains, with reconnection by an accredited service provider.
6. The supply is tested and restored, and the compliance paperwork is completed.

Warnings

The price shown is an indicative starting price; the final fixed price is confirmed in writing after a site assessment and quote.
Network requirements and approvals must be met where applicable, and any network charges are quoted separately.
Trenching through concrete or rock, driveway restoration and landscaping repairs are quoted separately.
Power is interrupted on the day of changeover, usually for several hours.
Meter board or switchboard replacement, if required, is quoted separately.

Frequently Asked Questions

Common signs are an older home planning major new loads, the main switch or service fuse limit being reached, lights dimming when large appliances start, or visibly deteriorated old cables. Calculating maximum demand for your current and planned loads is the reliable way to know. Please do not inspect or touch the mains yourself.

No, although the two can be done together. A consumer mains upgrade increases the capacity of the cable, often while staying single-phase. A three-phase upgrade changes the supply type and needs network approval and a new meter. If you plan large solar or fast EV charging, we assess whether combining both makes sense.

The supply must be disconnected while the old mains are removed and the new cable is connected, usually for several hours on the day. Trenching and conduit work are often completed beforehand so the outage is as short as possible. We confirm the timing with you well in advance so you can plan around it.

Sometimes. If the main new load is an EV charger, load management can slow charging when the home is busy, keeping total demand within the existing mains capacity. It does not help when the mains are deteriorated or the demand calculation shows a genuine shortfall. We tell you honestly which situation applies to your property.
Delivery Options

Service area & scheduling

Where we work

  • Sydney and a radius of roughly 200 km: Newcastle, the Central Coast, Wollongong, the Southern Highlands, the Blue Mountains, Bathurst, Orange, Lithgow, Goulburn and the Canberra region.

Timing

  • Usually completed 3-8 weeks after you accept the quote, depending on network coordination and trenching.

How your request works

  • Send your request and our team contacts you to arrange the site assessment. You receive a written fixed-price quote before any work starts.
  • All electrical work is carried out by licensed electricians; solar and battery design and installation by SAA-accredited installers.
  • Blue Energy Solar is a New Energy Tech Approved Seller and holds $20 million public liability cover.

Prices include GST.

Review
Please login or register to submit a review.
JoseFernandez
Great product the results are fascinant
02/08/2024 02:59 PM

Energy Market

Call us directly
0421 458 217
Send an Enquiry